UC Berkeley, Giannini Hall
Degenkolb is providing construction engineering support on the renovation and seismic retrofit of UC Berkeley’s Giannini Hall, which will protect and preserve the historic shell of the structure.
View Project
a person standing on a bridge
Loma Linda University, Medical Center, Central Plant SPC4D/NPC-5 4 Upgrades
Degenkolb was prime consultant for the SPC4D / NPC4 seismic upgrade of the 1964 steam plant, which serves Loma Linda Medical Center and Loma Linda University.
View Project
Loma Linda University, Medical Center, Central Plant SPC4D/NPC-4 Upgrades
181 Fremont
We worked with steel fabricator/erector, The Herrick Corporation, to provide an array of steel erection engineering services for this 800-foot mixed-use tower.
View Project
181 Fremont
Kaiser Oakland Hospital, Demolition Planning, Oakland, CA
View Project
a building under construction
Museum of Contemporary Art San Diego, Construction Engineering Support, San Diego, CA
View Project
inside view of a warehouse
SoFi Stadium, Steel Erection Services, Inglewood, California
View Project
a stadium under construction with multiple cranes
Park Tower at Transbay
We worked with general contractor Clark Construction to develop innovative tower crane foundation and tie-in schemes that leveraged the permanent structure and minimized removal operations.
View Project
a building under construction
Washington State Convention Center, On-Call GC Services, Seattle, WA
View Project
a construction site with cranes
Kaiser San Francisco Medical Center, 2200 O’Farrell Street MOB, Demolition Planning, San Francisco, CA
View Project
a diagram of a building
Lucile Packard Children’s Hospital Stanford, Expansion, Excavation Shoring, Palo Alto, CA
View Project
University of California, Berkeley Art Museum and Pacific Film Archive
Degenkolb served as the construction means and methods engineer, converting the 1930s era facility into an 83,000 square foot world-class museum.
View Project
Berkeley Art Museum and Pacific Film Archive
Pier 70 – Building 12 Lift, Construction Engineering Services, San Francisco, CA
View Project
telescoping lift at a construction site
690 Market Street Building, Adaptive Reuse San Francisco, CA
Prepared Construction Documents for temporary shoring and sequencing to remove all but the façade of this 12- and 16-story structure
View Project
a tall building with many windows
Park Tower at Transbay – Second
We worked with general contractor Clark Construction to develop innovative tower crane foundation and tie-in schemes that leveraged the permanent structure and minimized removal operations.
View Project
a building under construction
120 Stockton Street Building Renovation
Degenkolb is providing construction engineering services on the renovation of the former Macy’s Men’s Store in San Francisco.
View Project
a large warehouse with many rows of shelves
Highland Hospital, Demolition and Temporary Shoring, Oakland, CA
View Project
Stanford University, Sapp Center for Science Teaching and Learning
Adaptive re-use of a 1903 concrete, 4-story chemistry building into a modern day combined chemistry and biology teaching hall.
View Project
a building with stairs

Construction Engineering

Alan Roberts
Associate Principal
Cale Ash
Group Director, Principal
Charlie Chi
Project Engineer
Devon Lumbard
Group Director, Principal
man posing for the camera
Enrico Alvaro
Design Engineer
Jack Wegleitner
Project Engineer
Jeremy Callister
Principal
Jim Malley
Senior Principal
Lief Kaiper
Regional Business Development Director
Megan Schroeder
Business Development Manager
Robert Graff
Principal
Tim Nelson
Practice Area Leader, Principal
Tricia Ruby
Group Director, Principal

MSIRobot