a train on the railway tracks
College of Marin, Pomo Cluster

WHAT WE DID

Design Modernization including exterior siding replacement and full interior renovation of three science labs

Design modernization including an exterior siding replacement and full interior renovation, three science labs were to be updated and put back to use. Project adds a total of 10 classrooms to the campus. HVAC upgrades, and the replacement of two existing wood stairs with new steel stairs.

Features:
• New exterior siding repair

Benefits:
• Reclaims classrooms
• Improves user experience

Project Team

Holly Razzano
Practice Area Leader, Senior Principal

One of my bucket list items is to do a triathlon.

a man smiling in front of a flower bush
Travis Chrupalo
Project Engineer

Design engineer in the Oakland office.

a man smiling for the picture
Jay Yin
Associate Principal

I immigrated to the United States from Taiwan when I was 13, and grew up in Maryland.

MSIRobot