WHAT WE DID

Degenkolb designed the seismic upgrade of these steel braced frame buildings

Degenkolb designed the seismic upgrade of these steel braced frame buildings. Building 44 is a two-story, 250,000 square-foot, office building with a basement. Building 46 is a two-story, 175,000 square-foot, office building housing an important Executive Briefing Center. Degenkolb developed a unique approach for the upgrade utilizing exterior unbonded braces in a splayed buttress configuration. These buildings were seismically upgraded to improve life safety protection for the building occupants and were constructed without significant impact to the continued operation of the buildings.

Staff on the Project

a man wearing glasses
David Bonneville
Senior Principal

David has been at Degenkolb for over 35 years.

Roger Parra
Senior Principal

I oversee work for the Constellation Brands. 

Laurie Johnston
Practice Area Leader, Senior Principal

Both of my parents have large families (my Dad has 8 siblings and my Mom has 7) which resulted in 40 first cousins for me.

Adrian Nacamuli
Principal

I enjoy suffering through 100 mile long bicycle rides.

MSIRobot