Highland Hospital, Demolition and Temporary Shoring, Oakland, CA

WHAT WE DID

Degenkolb contributed to the design of this project, including a combination of temporary and permanent retaining walls up to 50’ tall, anchoring portions of the building, and additional excavation shoring.

The project entailed strengthening remnants of an existing building that had been demolished to prevent disturbance to the existing adjacent hospital. This included a combination of temporary and permanent retaining walls up to 50’ tall, anchoring portions of the building, and additional excavation shoring all designed by Degenkolb.

Staff on the Project

Andrew Scott
Practice Area Leader, Principal
Tim Nelson
Practice Area Leader, Principal
Robert Graff
Principal

MSIRobot