Park Tower at Transbay – Second

 

 

 

Park Tower, is a 43-story, 750,000 square foot office tower in San Francisco, California. Working for general contractor Clark Construction, we developed a concrete foundation and steel receiver frames to support the project’s tower crane. We coordinated with the project’s structural engineer-of-record to develop a crane foundation system that leveraged the building’s permanent drilled pile foundations while only requiring a slight increase to the thickness of the permanent structural mat slab within the tower crane’s base anchorage zone. We also developed a unique tie-in receiver structure that integrates with the permanent building framing to minimize removal of temporary structural steel after crane decommissioning. Our services also included a structural peer review of the climbing form work and platform systems that are proposed to be used for the construction of the building’s concrete core.

Staff on the Project

Tim Nelson
Practice Area Leader, Principal

I own and play a Keytar.

Alan Roberts
Associate Principal

I played cornet in a semi-professional British brass band in high school.

MSIRobot