aerial view of a city
a room with tables and chairs
a bathroom with a urinal and sinks
Greer Elementary School, Design Build

WHAT WE DID

Phased Design-Build delivery of comprehensive campus-wide upgrade and new classroom buildings, administration, and multi-purpose at Greer Elementary.

This project consists of the modernization and new construction of the Greer Elementary School campus that will rotate the school 90 degrees and feature three new classroom buildings, an administration building, and multi-purpose room twice the size of the current one. Two existing buildings containing 12 classrooms will be remodeled to match the new construction. The innovative design, known as Project JOE (Jump on Education), is focused on 21st century learning promoting a flexible and collaborative environment for students and staff. The school will remain occupied throughout construction, requiring the project to be broken up into phases and the students to be housed in temporary classrooms that will remain on site for the duration of the project. As buildings are complete, students will be moved into the newly constructed classrooms and students from existing classrooms will be moved to the temporary classrooms.

 

Features:

  • Three new classroom buildings
  • New administration building
  • New multi-purpose room
  • Design-Build delivery

 

 

 

Staff on the Project

Jason Scanlan
Principal

At 14 years I designed my first structure – a two-story playhouse in our backyard.

MSIRobot